Ways to Apply for a GEPCO New Connection
To apply for the new connection, you will require a CNIC (identity card) along with a property ownership document, a stamp vendor, a copy of the neighbour’s electricity bill, and documents verified by the Oath Commissioner or Grade-1 Class Officer.
You can easily apply for an online application rather than a manual process. The online process is listed below and is easier than the manual method. Both online and manual application methods are explained below.
Applying Online via ENC Portal

Visit the ENC Portal and click on the “Apply” option. You will be redirected to the online new connection application form. Then, complete the following details to proceed:
- Subdivision Information
- Applicant’s Particulars
- Contact Person Information
- Premises Details
-
Attachments:
- Property Document Copy
- Attested CNIC Copy of Applicant
- Attested CNIC Copy of Witness
- Neighbour Electricity Bill Copy
- Wiring Contractor’s Test Report (mandatory)
- After submitting the form, click on the “Track” option and enter your CNIC or tracking ID to check the status of your application.
Manual Application Process at GEPCO Office
If you want to manually apply, you need to follow the steps below:
- Visit your nearest local sub-divisional GEPCO office and collect a new connection form.
- Prepare the required documents mentioned in the form, such as name, address, CNIC, and other relevant details. If you are not the owner, obtain permission from the owner along with a stamped document.
- Verify those documents before submission by the Oath Commissioner.
- Submit the file along with payment proof at the GEPCO office.
- After submission, it typically takes 1 to 3 months to get a new connection.
Important Considerations
- Make sure all the submitted information is not incomplete or incorrect.
- If you submit fake documents or documents that do not belong to you, it can lead to serious complications.
- Make sure all documents are submitted with in time provided by GEPCO.
- Avoid unsafe PVC connections for safety. For example, weak PVC cables can lead to fire or short circuits.
- You can also hire third party service outside the GEPCO office for document preparations which will typically cost you around 500 to 700 PKR.
- If you are facing any issue during the new connection, you can call 118.
GEPCO New Connection Types, Load Limits & Installation Time 2026

GEPCO classifies new electricity connections into the following categories based on load, usage type, and installation time:
Category 1 (Single Phase) | Category 2 (Double Phase) | Category 3 (Triple Phase) |
|---|---|---|
Its load limit is 1 kW to 15 kW. Used for domestic households. | Its load limit is 16 kW to 70 kW. Used for commercial purposes. | Its load limit is 70 kW to 500 kW. |
Installation time is typically 30 Days. | Its Installation time is typically around 44 Days. | Installation time for a GEPCO new connection is typically 73 Days. |
Types of meters provided by GEPCO
GEPCO offers three main types of meters. The Green Meter is designed for solar users with net metering. The AMR Meter is used for automatic readings, while the AMI Meter is an advanced smart meter that provides real-time monitoring and control. Each type is designed for different usage needs.
Before choosing or installing a new electricity meter, it is always recommended to first check your bill using the GEPCO bill check online tool.
GEPCO Demand Notice & Charges
A demand notice is issued after submitting a new electricity connection application, along with a specified due date. The applicant is required to pay an estimated fee ranging from PKR 9,000 to 12,000 within this period.
This fee typically includes the installation of a new electricity meter and up to 40 meters of wiring. If additional wire is required to connect to the nearest electric pole, extra charges may apply. The total cost may also vary depending on installation requirements and location.
Required Documents Checklist
Here is a quick checklist to ensure you have all the required documents before proceeding to the next steps:
Completed Application Form for GEPCO new connection (Online/Printed Copy)
Applicant’s CNIC and Witness’s CNIC
Proof of Ownership
Owner’s NOC
Neighbour’s Electricity Bill
Signed Affidavit
Wiring Contractor’s Test Report
Undertaking (No Previous Dues)
Recent Passport-Size Photograph
Frequently Asked Questions (FAQs)
Conclusion
Getting a new GEPCO electricity connection is now a straightforward process, especially with the availability of online applications. By following the correct steps and preparing the required documents, you can complete the process smoothly without unnecessary delays.
Whether you apply online or visit the office, the system is designed to make the procedure simple and efficient. Once your application is approved and the required charges are paid, your connection is typically installed within the given timeframe.